Project to Reduce the Automatic Flushing Function of Urinals in Public Male Restrooms

The Company implemented a project to reduce the operation of the automatic flushing system of urinals in public male restrooms starting in 2024, by canceling the setting for automatic flushing every two hours. This adjustment was made because the area is used continuously and flushing already occurs during actual usage; therefore, additional automatic flushing cycles were unnecessary.
This measure enables the Company to manage water consumption more efficiently by reducing unnecessary water use, lowering water utility costs, and promoting responsible water resource utilization without affecting hygiene and cleanliness standards in the area. The project forms part of the Company’s sustainability initiatives, which focus on improving resource efficiency and reducing environmental impacts.
Performance Results
- Project resulted in a reduction of 388,800 liters of water per year
- Generating approximately 10,498 Baht in annual water cost savings, equivalent to an average reduction of about 1,065 liters per day or 32,400 liters per month.
In 2025, the project resulted in a reduction of 388,800 liters of water per year, generating approximately 10,498 Baht in annual water cost savings, equivalent to an average reduction of about 1,065 liters per day or 32,400 liters per month. In addition, considering the cumulative results from continuous implementation since 2024, the Company has achieved total water savings of approximately 777,600 liters (or 777.6 cubic meters) and cumulative water cost savings of approximately 20,996 Baht.